The State of Maine currently determines school subsidy based on the Essential Programs and Services Model (EPS.) The state has determined through EPS that the minimum amount MSAD #61 is required to raise for education is $18,045,064.79 for this school year. Of this amount, we are actually receiving $834,133.10, which is 4.42% of the total EPS allocation. Some districts receive almost 100% of their EPS allocation. For a quick nearby comparison, MSAD #6 receives 50% of their allocation. The reason for this difference is that the high property values in our four towns based on the extensive amount of lakefront property, causes the formula to determine that our local taxpayers have the ability to pay for their schools. This situation puts us in an especially difficult situation because we are requiring local taxpayers to raise almost $25 million to run our schools with almost no funding from the state during a very troubling economic period.
To bring in a budget that is the same amount as the current year, it will require finding savings to offset increased costs for transportation fuel, heating, food service, supplies, and salary/benefit increases, etc. As we embark on this very challenging budget year, administrators will be looking critically at all District programming and the level of service in each cost center. Over the last 3-5 years we have been cutting “around the edges” and trying very hard to keep class sizes small and not affect the students in the classroom. At this point, we have no more easy cuts to make. Approximately 88% of our school budget consists of personnel costs. So, unfortunately, we will be proposing personnel cuts to bring in the budget the School Board is requesting. Some possible cuts may affect all departments in order to be consistent across the buildings of the District.
As of the date of this post, 1/27/12, all administrators have submitted their preliminary budgets for the 2012-13 school year. These budgets have been presented to Sherrie Small, our Financial Coordinator and myself, along with one School Board member who attended each meeting. Each specific budget has been reviewed line by line, detailed questions have been asked and answered, and additional cuts have been suggested where applicable. The bottom line of each cost center compared to the current year and the major cuts/additions proposed have been reviewed by the Leadership Team twice. The budget was presented to the Finance Committee this week. Other than the additional cost for bonding of the high school/vocational project which was approved by District voters, the budget is level at his point. As predicted above, the cuts required to bring in a level budget are extensive. I will publish the timeline for meetings related to the budget and major details of the proposed budget in future posts.